Open role
Production Planning & Lot-Control Lead
Why this work matters
Touchdown is engineering modular manufacturing for the chips and memory systems future computing needs. This role helps turn a buyer's physical result into a qualified process or a defensible decision to use an existing supplier. Advanced packaging is our intended first fab class; no production fab is operating today.
Overview
You will make the planned route and actual movement of every lot understandable. The early work is a finite-capacity model for an authorized route, including queue times, shortages, rework, test, holds, and release. You will use measured cycle time and accepted-good output to make customer commitments, and expose when a partner route is the better choice.
What you will own
- Plan small lots, dispatch, WIP, holds, changeovers, traceability, and shipping within qualified capacity.
- Model capacity, dispatch rules, WIP, setup changes, queue time, and bottlenecks.
- Schedule only qualified routes and maintain holds, traveler state, and material traceability.
- Communicate realistic customer commitments from yield and cycle-time evidence.
- Build a contingency plan for equipment downtime, supplier delay, low yield, and urgent customer changes.
- Reconcile physical workpieces, digital lot status, scrap, samples, and shipment records at each handoff.
Technical territory
Travelers, dispatch rules, WIP, bottleneck analysis, queue-time limits, changeovers, inventory reconciliation, rework, hold codes, release authority, accepted-good yield, cycle time, and shipping handoff.
Representative outputs
- A capacity and lot-flow plan that shows bottlenecks, holds, cycle time, and customer commitments.
- A finite-capacity lot plan with bottleneck and contingency assumptions.
- A dispatch and hold procedure with cycle-time and accepted-good reporting.
- A weekly capacity and commitment review showing assumptions, risks, owner actions, and decision dates.
What success looks like
- The plan exposes capacity limits instead of hiding them in dates.
- Every lot has a valid status, owner, and next action.
- A customer date can be traced to qualified capacity and a realistic accepted-good estimate.
- Holds, rework, and losses remain visible through final reconciliation.
What you bring
- Fab, OSAT, or precision-manufacturing planning and production control.
- Planned lots in a fab, OSAT, or high-mix precision-manufacturing line.
- Can operate production control with shortages, rework, and equipment downtime.
- Can reconcile physical counts with system records and shipping status.
- Can use actual cycle time and yield data to challenge an overcommitted production plan.
- Can run disciplined lot handoffs among process, equipment, test, quality, and shipping teams.
Helpful experience
- Pilot-line scheduling
- MES and inventory-control integration
- High-mix packaging flows
- Finite-capacity scheduling
- Cost per accepted unit analysis
How the role works
- Applications are open; the exact work location, arrangement, compensation, and start date will be discussed during hiring.
- Early work can produce engineering plans and partner comparisons. Hands-on work begins only at qualified, authorized facilities.
- You will work with process, equipment, quality, test, customer, and supplier owners as the scope requires.
Show a real process, tool, workpiece, or product decision you owned, the measurements behind it, and what another team could reproduce.